Sect. | Item | Keperluan (Read in conjunction with arch. drawings, specs, approved standards etc) | Cadangan/ Rekabentuk (Read in conjunction with civil drawings & details) | Ulasan/ Tindakan Penyemak | Tindakan Pereka | Keputusan PPK/ KPPK |
A | . | GENERAL | Klik2Edit | . | . | . |
A | 1.0 | Scope of Works | Klik2Edit | Klik2Edit | Klik2Edit | Klik2Edit |
A | 2.0 | Special Requirements | Klik2Edit | Klik2Edit | Klik2Edit | Klik2Edit |
A | 3.0 | Design criteria | Klik2Edit | Klik2Edit | Klik2Edit | .. |
A | 4.0 | Standard and Codes of Practice | Klik2Edit | Klik2Edit | Klik2Edit | Klik2Edit |
A | 5.0 | Independent Checker | Klik2Edit | Klik2Edit | Klik2Edit | Klik2Edit |
A | 6.0 | Soil Investigation | Klik2Edit | Klik2Edit | Klik2Edit | Klik2Edit |
A | 7.0 | Anti-Termite Treatment | Klik2Edit | Klik2Edit | Klik2Edit | Klik2Edit |
A | 8.0 | Materials and Workmanship | Klik2Edit | Klik2Edit | Klik2Edit | Klik2Edit |
A | 9.0 | Contractor’s Proposal | . | Klik2Edit | Klik2Edit | Klik2Edit |
A | 9.0.1 | Senarai Lukisan | Tidak dikemuka | Sila kemukakan | Klik2Edit | Klik2Edit |
A | 9.0.2 | Susunatur lukisan | Ada , lengkap | Klik2Edit | Klik2Edit | Klik2Edit |
A | 9.0.3 | Title Block | Ada , tidak standard | Kaji standard JKR | Klik2Edit | Klik2Edit |
A | 9.0.4 | Skala | Ada , lengkap | Klik2Edit | Klik2Edit | Klik2Edit |
A | 9.0.5 | Legend dan nota | Ada , tidak lengkap | Rujuk ulasan di bawah | Klik2Edit | Klik2Edit |
A | 9.0.6 | Persembahan A1/A3 & standard f_o_n_t_s | Klik2Edit | Klik2Edit | Klik2Edit | Klik2Edit |
A | 9.0.7 | Skop / Laporan / Dsgn criteria / Pengiraan r/b:- | Ada , tidak standard | Rujuk ulasan dibawah | Klik2Edit | Klik2Edit |
A | 9.0.8 | Earthwork | Ada , tidak lengkap | Rujuk ulasan item-item B1 | Klik2Edit | Klik2Edit |
A | 9.0.9 | Drainage System | Ada , tidak lengkap | Rujuk ulasan item-item B2 | Klik2Edit | Klik2Edit |
A | 9.0.10 | Road System | Ada , tidak lengkap | Rujuk ulasan item-item B3 | Klik2Edit | Klik2Edit |
A | 9.0.11 | Sewerage System | Ada , tidak lengkap | Rujuk ulasan item-item B5 | Klik2Edit | Klik2Edit |
A | 9.0.12 | Water Supply | Ada , tidak lengkap | Rujuk ulasan item-item B4 | Klik2Edit | Klik2Edit |
A | 9.0.13 | Laporan Penyiasatan Tapak ( S I ) | Tidak dikemuka | Sila kemukakan | Klik2Edit | Klik2Edit |
A | 9.0.14 | Laporan EIA atau EMP | Tidak dikemuka | Sila kemukakan | Klik2Edit | Klik2Edit |
A | 9.0.15 | Pelan Ukur Kejuruteraan | Tidak dikemuka | Sila kemukakan | Klik2Edit | Klik2Edit |
A | 9.0.16 | Cop P.E. dan Tandatangan | Tiada | Sila Cop P.E dan tandatangan - test on iphone keys | Klik2Edit | Klik2Edit |
A | 10.0 | Samples | Klik2Edit | Klik2Edit | Klik2Edit | Klik2Edit |
A | 11.0 | Compliance to Rules and Regulations | Klik2Edit | Klik2Edit | Klik2Edit | Klik2Edit |
A | 12.0 | Sufficiency of Proposal | Klik2Edit | Klik2Edit | Klik2Edit | Klik2Edit |
A | 13.0 | Standard Specification | Klik2Edit | Klik2Edit | Klik2Edit | Klik2Edit |
A | 14.0 | Material Testing Laboratory and Staff | Klik2Edit | Klik2Edit | Klik2Edit | Klik2Edit |
A | 15.0 | Supervision, Inspection and Test | Klik2Edit | Klik2Edit | Klik2Edit | Klik2Edit |
A | 16.0 | Covering up of Works | Klik2Edit | Klik2Edit | Klik2Edit | Klik2Edit |
A | 17.0 | Submittals | Klik2Edit | Klik2Edit | Klik2Edit | Klik2Edit |
A | 18.0 | Quality Assurance Plan | Klik2Edit | Klik2Edit | Klik2Edit | Klik2Edit |
A | 19.0 | Familiarisation with Site and Local Condition | Klik2Edit | Klik2Edit | Klik2Edit | Klik2Edit |
A | 20.0 | Obligation of Contractor & Consultant on Safety on Site & Adjoining Properties | Klik2Edit | Klik2Edit | Klik2Edit | Klik2Edit |
A | 21.0 | As-Built Drawings | Klik2Edit | Klik2Edit | Klik2Edit | Klik2Edit |